Dedicated
team of technical staff for field services
Teams from Nordon Cryogénie serve customers on every continent. The secret of our excellent responsiveness is that only personnel required to perform operations with high added value and specific equipment are rushed to customers’ sites. This minimized logistic approach means fewer formalities (visas, customs clearance, packing, etc.). We achieve optimal efficiency in synergy with local firms which take care of peripheral activities and place some of their resources at our disposal.
Our services typically include:
| |
Modifying or upgrading existing equipment,
|
|
Supervising installation operations directly concerning our equipment,
|
| |
Carrying out routine checks during shutdowns,
|
| |
Replacing units, completely or partially,
|
| |
Examining and repairing damaged equipment,
|
| |
Dealing with certain types of plugging,
|
| |
Supervising resistance and leak tests,
|
| |
Organizing and managing installation on site, mandatory tests, assembly and welding,
|
| |
Etc.
|
Management
of site assembly
Some aspects of work sites
1994/1995 – Unit GNL
SONATRACH
|
1994/1995 – SOFREGAZ
/ SONATRACH LNG plant
Site
location: Skikda – Algeria
Scope of work: Upgrading
/ replacement / testing (interstream
leaks, pressure drops) of heat exchangers
|

1996 – GAIL –
C2/C3 recovery Auraiya plant
|
1996 – GAIL – Auraiya
C2/C3 recovery plant
Site location:
Auraiya - India
Scope of work: Final
assembly on site of two half banks + final
pneumatic testing
|
1998 – BOREALIS –
Ethylene plant
|
1998 – BOREALIS – Ethylene
Plant
Site location:
Sines - Portugal
Scope of work: Exchanger
upgrading for 3 batteries
Replacement of all headers and manifolds
|
1998 – ILVA
2000 - Air separation plant
|
1998 – ILVA
2000 – Air separation plant
Site location:
Taranto – Italy
Scope of work: Final
assembly on site of exchanger bank
|

2002 – Air
Liquide Belgium –
Reversing exchangers
|
2002 – Air
Liquide Belgium – Reversing exchangers
Site location:
Caral - Belgium
Scope of work: Replacement
of exchanger lines (5 cores per bank),
piping assembly
|
2002 – Air
Liquide Belgium –
Reversing exchangers
|
2002 – Air
Liquide Belgium – Reversing exchangers
Site location:
Mons - Belgium
Scope of work: Replacement
of exchanger lines (5 cores per bank)
|

2002– MESSER
- Air separation plant
|
2002 – MESSER – Air
separation plant
Site location:
Dillingen - Germany
Scope of work: Replacement
of 4 banks (10 cores / bank)
+ Stainless Steel & Aluminum piping
connections
|
2003
- SASOL -
Air Separation Plant
|
2003 – SASOL – Air
separation plant
Site location:
Secunda – South Africa
Scope of work: Final bank
installation on site
Piping assembly
|
|